How it works

From first look to front door.

Six steps, one team and one specification that stays the same from your screen to your site.

Inside the workshop

The six steps

You always know what happens next.

Each step ends with something you can hold: a specification, a quote, a date.

01

Week 0

Choose your model

Compare three homes by floor area, footprint and starting price. Pick the one that suits your plot and the way you live.

You get: a clear starting price

02

Week 0

Shape your specification

Choose the layout, the cladding, the interior and the upgrades. The drawing and the price breakdown follow every choice.

You get: a specification you can share with one link

03

Week 1

Site review and written quote

We look at access, ground and services with you, then send a written quote that lists the home, the options and the site work.

You get: a quote that matches your specification line for line

04

Weeks 2 to 14

Built indoors

Your home is made in our workshop, out of the weather. Kitchens, bathrooms, wiring and finishes are fitted and checked before it leaves.

You get: progress photos every fortnight

05

Week 15

Delivered and assembled

Modules travel by road and are craned onto their foundations. Our crew joins, seals and commissions the home, usually within days.

You get: a weathertight home in days

06

Week 16

Handover

We walk every room with you, hand over the keys and the manuals, and stay on call through your first year.

You get: the keys

Reading the price

One breakdown. Three plain parts.

A

In the home price

The house, its factory-fitted interior and assembly on your site by our own crew.

B

Priced options

Layouts, finishes and upgrades each carry their own figure, added the moment you pick them.

C

Quoted for your site

Delivery, foundations and connections depend on your land, so we price them after a site review.

Good questions

Asked before every build.

Can I change the layout after I send my specification?

Yes. Your specification stays editable until you approve the written quote, and every change updates the price breakdown.

How long does a home take?

Most homes are ready 12 to 16 weeks after the order. The factory build takes the longest and the assembly on site takes days.

Do you handle foundations and connections?

We do. They are surveyed and quoted for your site, then scheduled so the ground is ready the week your home arrives.

Can I visit the workshop?

Any weekday. Book a visit and walk the line with the people who will build your home.

What do I need before I enquire?

A rough location and an idea of the model you like. Everything else we can work out together.

Ready when you are

Step one takes two minutes.

Create a free website with Framer, the website builder loved by startups, designers and agencies.