How it works
From first look to front door.
Six steps, one team and one specification that stays the same from your screen to your site.

Inside the workshop
The six steps
You always know what happens next.
Each step ends with something you can hold: a specification, a quote, a date.
01
Week 0
Choose your model
Compare three homes by floor area, footprint and starting price. Pick the one that suits your plot and the way you live.
You get: a clear starting price

02
Week 0
Shape your specification
Choose the layout, the cladding, the interior and the upgrades. The drawing and the price breakdown follow every choice.
You get: a specification you can share with one link
03
Week 1
Site review and written quote
We look at access, ground and services with you, then send a written quote that lists the home, the options and the site work.
You get: a quote that matches your specification line for line

04
Weeks 2 to 14
Built indoors
Your home is made in our workshop, out of the weather. Kitchens, bathrooms, wiring and finishes are fitted and checked before it leaves.
You get: progress photos every fortnight

05
Week 15
Delivered and assembled
Modules travel by road and are craned onto their foundations. Our crew joins, seals and commissions the home, usually within days.
You get: a weathertight home in days

06
Week 16
Handover
We walk every room with you, hand over the keys and the manuals, and stay on call through your first year.
You get: the keys

Reading the price
One breakdown. Three plain parts.
A
In the home price
The house, its factory-fitted interior and assembly on your site by our own crew.
B
Priced options
Layouts, finishes and upgrades each carry their own figure, added the moment you pick them.
C
Quoted for your site
Delivery, foundations and connections depend on your land, so we price them after a site review.
Good questions
Asked before every build.
Can I change the layout after I send my specification?
Yes. Your specification stays editable until you approve the written quote, and every change updates the price breakdown.
How long does a home take?
Most homes are ready 12 to 16 weeks after the order. The factory build takes the longest and the assembly on site takes days.
Do you handle foundations and connections?
We do. They are surveyed and quoted for your site, then scheduled so the ground is ready the week your home arrives.
Can I visit the workshop?
Any weekday. Book a visit and walk the line with the people who will build your home.
What do I need before I enquire?
A rough location and an idea of the model you like. Everything else we can work out together.